File #: 2010-0454    Version:
Type: Ordinance Status: Passed
File created: 8/23/2010 In control: Environment and Transportation Committee
On agenda: 10/4/2010 Final action: 10/4/2010
Enactment date: Enactment #: 16941
Title: AN ORDINANCE relating to the establishment of the 212th Avenue Northeast realignment from the intersection of existing 212th Avenue Northeast northerly to Northeast Woodinville-Duvall Road.
Sponsors: Larry Phillips, Kathy Lambert
Indexes: Duvall, City of, Woodinville, City of
Attachments: 1. 16941.pdf, 2. B. County Road Engineer's Report, 3. 2010-0454 Transmittal Letter.doc, 4. 2010-0454 Fiscal Note.xls, 5. 2010-0454 Attachment to Transmittal Letter--Vicinity Map - NE WDR at 212th Ave NE.doc, 6. 2010-0454 Determination of Nonsignificance.pdf, 7. 2010-0454 Environmental Checklist.pdf, 8. 2010-0454 Staff report - realign 212th Ave. NE, 9. 2010-0454 -Att 4 - draft amendment.pdf, 10. 2010-0454 hearing notice.doc, 11. 2010-0454 Revised Staff Report - realign, 12. A. Map of NE Woodinvile - Duvall Road at 212th Avenue NE - Establishment Plan, 13. B. County Road Engineer's Report revised 8-31-10, 14. C. County Road Engineer's Field Notes, 15. D. NE Woodinville-Duvall Rd @ 212th Ave NE--Channelization Plan
Staff: Carlson, Paul
Drafter
Clerk 09/01/2010
title
AN ORDINANCE relating to the establishment of the 212th Avenue Northeast realignment from the intersection of existing 212th Avenue Northeast northerly to Northeast Woodinville-Duvall Road.
body
BE IT ORDAINED BY THE COUNCIL OF KING COUNTY:
SECTION 1. The director of the department of transportation has made an examination of establishment of the 212th Avenue Northeast realignment from the intersection of existing 212th Avenue Northeast northerly to Northeast Woodinville-Duvall Road along the course and description set forth below and has made a favorable report upon the same, as required by RCW 36.81.050.
SECTION 2. Said road shown on Attachment A to this ordinance shall be established as follows:
Those portions of the Southeast Quarter of Section 8 and of the Southwest Quarter of Section 9, all in Township 26 North, Range 6 East, Willamette Meridian, King County, Washington, and being described as follows:
Commencing at the Southeast corner of said Section 8; thence N 01°02’59” E along the east line of said Section 8 being also the west line of said Section 9, a distance of 1785.77 feet to the point of curvature of a non-tangent curve to the right, the radial center of which bears S 88°55’53” E, a distance of 380.00 feet, said point being Point of Beginning of this establishment centerline, said point having a calculated NAD83-91 Washington State plane coordinate of N276893.28, E1340287.27 at Engineer’s Station 99+73.50; thence along said curve to the right, through a central angle of 40°28’51”, an arc distance of 268.48 feet to Engineer’s Station 102+41.98; thence N 41°44’20” E, on a non-tangent bearing, a distance of 170.64 feet to Engineer’s Station 104+12.62, said point being on the right-of-way centerline of Northeast Woodinville-Duvall Road, said point having a calculated NAD83-91 Washington State Plane coordinate of N277265.57, E1340496.42, and the terminus of said establishment centerline.
The length of said establ...

Click here for full text