File #: 2010-0200    Version:
Type: Ordinance Status: Passed
File created: 4/19/2010 In control: Budget and Fiscal Management Committee
On agenda: 5/10/2010 Final action: 5/10/2010
Enactment date: 5/21/2010 Enactment #: 16821
Title: AN ORDINANCE authorizing the King County executive to execute a property exchange agreement between King County and the Washington state Department of Transportation involving portions of Metro's Ryerson Base, located in council district eight.
Sponsors: Julia Patterson
Indexes: Metro, Property, Washington, State of
Attachments: 1. 16821.pdf, 2. A. The Exchange Agreement, 3. 2010-0200 Transmittal Letter.doc, 4. 2010-0200 Fiscal Note.xls, 5. 2010-0200 Attachment 1 to Transmittal Letter Background.pdf, 6. 2010-0200 Attachment 2 to Transmittal Letter Aerial Photo.pdf, 7. 2010-0200 Attachment 3 to Transmittal Letter Aerial Plan.pdf, 8. 2010-0200 Attachment 4 to Transmittal Letter Depiction of Exchanged Property Rights.pdf, 9. 2010-0200 Attachment 5 to Transmittal Letter MOA.pdf, 10. 2010-0200 Attachment 6 to Transmittal Letter Temporary Construction Easement.pdf, 11. 2010-0200 Attachment 7 to Transmittal Letter Compensation Agreement.pdf, 12. 2010-0200 Staff Report 4-20-10, 13. 2010-0200 REVISED Staff Report, 14. 2010-0200 hearing notice.doc, 15. A. The Exchange Agreement
Drafter
Clerk 04/27/2010
title
AN ORDINANCE authorizing the King County executive to execute a property exchange agreement between King County and the Washington state Department of Transportation involving portions of Metro's Ryerson Base, located in council district eight.
body
BE IT ORDAINED BY THE COUNCIL OF KING COUNTY:
SECTION 1. Findings:
A. King County's department of transportation, metro transit division ("Metro"), is custodian of Ryerson Base ("the base"), located at 1200 Fourth Avenue South in the City of Seattle (Assessor's Parcel Number 766620-4685). The base encompasses approximately 8.46 acres and is used as a Metro bus terminal including an operation and maintenance facility, car wash, fuel buildings and asphalt bus parking lot.
B. The Washington State Department of Transportation ("WSDOT") is constructing an elevated west-bound ramp over Third Avenue ("the flyover ramp") as Phase 2 of the SR 519 / I-90 to SR 99 Intermodal Access Project ("the project"). WSDOT's project is intended to improve east-west traffic flow between Seattle's waterfront, sporting facilities, dock areas and the Interstate 5/Interstate 90 freeway systems.
C. The project requires that WSDOT acquire from King County, by condemnation if necessary, an air-rights corridor for the flyover ramp superstructure and fee simple acquisition of land for the pier foundation all located within the base. In exchange King County will receive the fee interest in land previously leased from WSDOT, which is needed to improve operation of the base, together with payment for WSDOT's temporary use of base property during construction.
D. The proposed exchange agreement provides for WSDOT to receive from King County, a quitclaim deed for the fee interest in the air-rights corridor and west pier foundation; together with a permanent easement for construction, maintenance, repair and utilities. In exchange King County will receive from WSDOT, a quitclaim deed for the majority of the...

Click here for full text