Drafter
Clerk 01/25/2010
Title
AN ORDINANCE relating to road fees; setting the mitigation payment system program project list and providing for an updated road mitigation payment system (MPS) fee schedule to reflect the termination of the reciprocal interlocal agreement with the city of Issaquah; amending Ordinance 11617, Section 43 and Attachment B, as amended, and K.C.C. 14.75.040 and Ordinance 11617, Section 49, as amended, and K.C.C. 14.75.100.
Body
BE IT ORDAINED BY THE COUNCIL OF KING COUNTY:
SECTION 1. Ordinance 11617, Section 43 and Attachment B, as amended, and K.C.C. 14.75.040 are each hereby amended to read as follows:
A. Fee schedules stating the amount of the MPS fee which residential development shall pay for development subject to MPS fees are set forth in ((K.C.C. 14.75.040 F.)) subsection E. of this section as described in ((K.C.C. 14.75.040)) subsection D. ((and E.)) of this section. Subsequent fee schedules shall be established ((pursuant to)) in accordance with K.C.C. 14.75.050. All other development shall pay an MPS fee individually calculated by the department, as set forth in K.C.C. 14.75.050.B. The MPS administrative fee, which all developers shall pay, is set forth in K.C.C. 14.75.080 and 14.75.090.
B. For purposes of this chapter, the county is divided into service districts as set forth in Attachment A to Ordinance 13696. In each service district, similar types of residential development shall pay the same MPS fee, unless the amount of the fee is altered because:
1. Unusual circumstances exist and the department adjusts the amount of the fee as provided in ((K.C.C. 14.75.040)) subsection C. of this section; or
2. The developer submits studies or data showing that the fee as set forth in the applicable schedule or as calculated by the department is in error, as provided in K.C.C. 14.75.150.
C. The department may adjust the standard impact fee as set forth in the fee schedules at the time the fee is imposed to consider unusual circumstances in specific cases to ensure that MPS fees are imposed fairly. The department shall set forth its reasons for adjusting the standard MPS fee in written findings.
D. ((The fee schedule in K.C.C. 14.75.040F for residential dwelling units is effective October 28, 2002.
E.)) The multifamily residential fee shall be determined based on the appropriate single family fee shown ((K.C.C. 14.75.040F)) in subsection E. of this section multiplied by 0.6. The residential MPS fee for any unincorporated area not within a zone listed on the King County residential fee schedule shall be one hundred eighty-nine dollars.
((F.)) E. King County residential fee schedule.
Zone $Fee Zone $Fee Zone $Fee Zone $Fee
70 $((24)) 23 71 $((27)) 26 75 $((61)) 59 85 $((1082)) 1078
86 $((330)) 325 88 $((348)) 342 89 $((457)) 445 90 $((865)) 831
102 $((223)) 195 108 $((2125)) 2119 113 $((256)) 254 115 $((451)) 449
117 $((1078)) 1077 120 $((305)) 304 121 $((183)) 182 124 $((130)) 129
126 $((76)) 75 128 $87 129 $80 132 $((79)) 78
133 $1 134 $((4621)) 4618 135 $((3380)) 3374 136 $((4545)) 4542
137 $((4651)) 4644 138 $((3777)) 3759 139 $((3164)) 3152 140 $((1910)) 1872
141 $((1741)) 1707 142 $((1685)) 1596 143 $((1517)) 1341 144 $((791)) 656
145 $((746)) 597 146 $((793)) 631 147 $((617)) 403 148 $((411)) 258
149 $((371)) 225 176 $((42)) 40 177 $((37)) 34 178 $((18)) 16
179 $((11)) 10 180 $((23)) 21 181 $35 182 $((48)) 47
183 $((60)) 59 184 $((68)) 67 185 $((147)) 144 187 $43
188 $((51)) 50 189 $((63)) 62 190 $((55)) 54 191 $((69)) 68
192 $((85)) 84 194 $((166)) 164 195 $((137)) 134 196 $((262)) 258
199 $((137)) 136 200 $((81)) 78 215 $((1283)) 1282 216 $((797)) 796
223 $((143)) 142 226 $229 227 $169 232 $166
233 $196 234 $238 235 $((178)) 177 236 $200
239 $((76)) 75 240 $50 241 $40 242 $75
243 $((75)) 74 257 $35 258 $60 259 $65
260 $51 263 $38 264 $((2975)) 1351 265 $((889)) 588
266 $((1581)) 699 67 $((1845)) 1777 268 $((1402)) 951 269 $((1082)) 778
270 $((1020)) 878 271 $((1099)) 723 272 $((1023)) 616 273 $((1161)) 568
274 $((2034)) 1975 275 $((4311)) 4284 276 $((2400)) 2345 277 $((1080)) 1006
278 $((1045)) 1029 279 $((1291)) 1275 280 $((558)) 545 281 $((1689)) 1650
282 $((653)) 529 283 $((518)) 415 284 $((513)) 467 289 $((378)) 377
290 $((421)) 420 292 $((866)) 865 295 $5488 296 $((7535)) 7534
297 $((997)) 996 298 $2928 299 $((6474)) 6473 300 $((1925)) 1923
301 $((2050)) 2048 302 $((2018)) 2017 303 $((6455)) 6454 304 $((1962)) 1960
305 $((4734)) 4732 306 $((6330)) 6328 307 $((6058)) 6056 311 $((1092)) 1091
312 $((1577)) 1576 313 $((1053)) 1052 314 $((1581)) 1580 316 $((258)) 257
317 $((315)) 314 318 $((524)) 523 319 $((427)) 426 320 $((1207)) 1205
321 $((1402)) 1401 325 $((1374)) 1372 326 $((2295)) 2293 327 $((1901)) 1899
328 $((1256)) 1253 331 $((4748)) 4739 333 $((829)) 826 334 $((1775)) 1772
335 $((1862)) 1857 336 $((4696)) 4688 337 $((6406)) 6392 338 $((5014)) 4972
339 $((5615)) 5597 340 $((3181)) 3179 341 $((3362)) 3359 342 $((3765)) 3756
343 $((1246)) 1244 344 $((2931)) 2925 345 $((3752)) 3741 346 $((3959)) 3948
347 $((1812)) 1777 348 $((2957)) 2950 349 $((2997)) 2985 350 $((1669)) 1638
351 $((650)) 649 354 $((767)) 764 355 $((1606)) 1601 356 $((695)) 693
357 $((1552)) 1547 358 $((2200)) 2193 359 $((1711)) 1705 363 $((2562)) 2555
365 $((617)) 611 366 $((918)) 902 367 $((2775)) 2752 369 $((2932)) 2912
370 $((495)) 494 371 $((556)) 555 372 $((388)) 385 373 $((497)) 493
374 $((181)) 179 375 $((322)) 319 376 $((368)) 365 377 $((251)) 248
378 $((447)) 438 379 $((237)) 234 380 $((218)) 214 381 $((172)) 168
382 $6200 383 $((5584)) 5582 384 $((4880)) 4879 385 $((5843)) 5842
386 $((5481)) 5479 387 $((5007)) 5006 388 $((7136)) 7133 389 $((4819)) 4808
390 $((3313)) 3310 391 $((3201)) 3195 392 $((3828)) 3807 393 $((4698)) 4689
394 $((4784)) 4773 395 $((2327)) 2307 396 $((4799)) 4784 397 $((3061)) 3037
398 $((3109)) 3074 399 $((2223)) 2201 400 $((2091)) 2062 401 $((1412)) 1380
402 $((1414)) 1285 403 $((1204)) 1102 404 $((1093)) 970 405 $((1124)) 944
406 $((2227)) 1987 407 $((2169)) 1790 408 $((3253)) 2810 409 $((3031)) 2699
410 $((4295)) 3346 411 $((1156)) 851 416 $((3693)) 2596 417 $((2436)) 1728
418 $((2364)) 1420 419 $((1483)) 901 424 $((872)) 565 425 $((836)) 493
426 $((899)) 603 427 $((719)) 402 428 $((1547)) 1136 431 $((991)) 912
432 $((2303)) 2131 433 $((2367)) 1715 434 $((1540)) 804 435 $((1328)) 661
436 $((2293)) 1086 437 $((1222)) 786 439 $((1231)) 1204 440 $((4597)) 4550
441 $((2164)) 2035 442 $((2918)) 2878 443 $((2129)) 1993 449 $((2750)) 2700
450 $((1565)) 1546 451 $((1675)) 1384 452 $((2139)) 1981 453 $((1485)) 1108
454 $((2478)) 2367 455 $((449)) 352 456 $((1412)) 523
Any unincorporated residential fee not otherwise listed in this subsection ((F)) E. is $189.
SECTION 2. Ordinance 11617, Section 49, as amended, and K.C.C. 14.75.100 are each hereby amended to read as follows:
A. In conjunction with the department's review and update of the Transportation Needs Report ("TNR"), or its successor, element of the King County Comprehensive Plan the department shall do the following:
1. Identify each project that is growth-related and the proportion of each such project that is growth-related;
2. Forecast the total money available from taxes and other public sources for road improvements over the ((multi year)) multiyear program((.));
3. Calculate the amount of MPS fees already paid; and
4. Identify those MPS projects that have been or are being built but whose performance capacity has not been fully utilized.
B. The department shall use this information to prepare a draft MPS project list, which shall comprise:
1. The projects in the TNR, or its successor, in order of priority, that are growth-related and that are capable of being funded with the forecast public money and the MPS fees already paid; and
2. The MPS projects already built or funded under this chapter whose performance capacity has not been fully utilized.
C. The council shall by ordinance establish the MPS project list by adopting, with or without modification, the department's draft list.
D. Once a project is placed on the MPS project list, a fee shall be imposed on every development that impacts the project until the project is removed from the list by one of the following means:
1. The council by ordinance removes the project from the MPS project list, in which case the fees already collected will be refunded if necessary to ensure that the MPS fee remains reasonably related to the traffic impacts of development that have paid an MPS fee. However, a refund shall not be necessary if the council transfers the fees to the budget of another project that the council determines will mitigate essentially the same traffic impacts; or
2. The capacity created by the project has been fully utilized, in which case the department shall administratively remove the project from the MPS project list.
E. The MPS project list in this subsection E. shall be used by the department of transportation in preparing the mitigation payment system program fee schedules and in calculating mitigation payment system program fees.
Jurisdiction Project Project Name From To MPS Cost
Number
County B-6 NE 132 ST/NE 128 ST 184 AVE NE 196 AVE NE $6,134,000
County B-9.10 AVONDALE RD WOOD-DUVALL RD NE 155 ST $8,361,000
County B-9.20 AVONDALE RD PH III NE 155 ST NE 133 ST $4,920,000
County B-9.30 Woodinville-Duvall Rd @ Avondale Rd NE $2,806,000
County B-23 NE UNION HILL RD 198 AVE NE 206 AVE NE $11,437,000
County B-29 AVONDALE RD REDMOND C/L AVONDALE PL NE $11,089,000
County B-30 AVONDALE RD PH III AVONDALE PL NE NE 132 ST $7,544,000
County B-56.12 NOVELTY HILL RD STAGE 2 AVONDALE RD NE 244 AVE NE $20,697,000
County B-56.20 NOVELTY HILL -EAST- REDMOND AVONDALE RD NE REDMOND C/L $1,029,000
County ES-2.50 E LK SAMMAMISH PKWY INTERST @ INGLEWOOD HILL @ THOMPSON RD $1,641,000
RD
County ES-5.10 SE 56 ST BRIDGE SE 56 XING ISSAQUAH CREEK $582,000
County ES-6.20 E LK SAMMAMISH PKWY SE 56 St Issaquah Fall City Rd $5,794,000
County ES-6.30 E LK SAMMAMISH PKWY ISSAQ FALL CITY RD I-90 on Ramp $6,347,000
County ES-7.30 SUNSET INTERCHANGE I-90 IMPRVMTS $2,022,000
County ES-12.22 ISSQ-PINE LK RD PH I SE 48 ST ISSAQUAH FALL $5,022,000
CONSTRUCTION CITY RD
County ES-15.10 ISSQ-FALL CITY RD PH II ISSQ-PINE LK RD 2300 ' EAST OF ISSQ $4,109,000\par PINE LK RD
County ES-15.42 ISSAQUAH - FALL CITY RD - PHIII APPROX SE 48 ST KLAHANIE DR $6,993,000
County ES-48.12 SPAR NORTH LINK STAGE 1 ISSQ-FALL CITY/ GRAND RIDGE MPD $20,550,000
PINE LK
County ES-48.22 SPAR SOUTH LINK CONST GRAND RIDGE MPD I-90 SUNSET $30,232,000
INTERCHANGE
County ES-75.22 SAHALEE WAY CONST NE 50 ST SR-202 $805,000
County F-24 S 272 ST SR-99 16 AVE S $1,487,000
County G-6.10 GREEN RIVER BRIDGE PROJECTS 83 AVE S @ GREEN RIV $2,179,000
County G-6.20 EAST VALLEY HIGHWAY GREEN RIVER BRIDGE S 277 ST $689,000
County G-6.30 GREEN RIVER OVERFLOW BRIDGE CROSSING GREEN RIV $259,000
County G-8.40 S 196 ST / S 200 ST CORRIDOR W VALLEY HWY ORILLIA RD $5,771,000
County G-85 55 AVE S @ S 277 ST $938,000
County H-36.20 1 AVE S S 146 ST S 160 ST $433,000
County H-48 4 AVE SW @ SW 136 ST $222,000
County NC-2 LAKEMONT BLVD EXTENSION 171 AVE SE NEWPORT WAY $9,369,000
County NC-5.10 ELLIOTT BRIDGE NO: 3166 ON 149 AVE SE XING CEDAR RVR $8,447,000
County NC-5.20 149 AVE SE SR-169 ELLIOT BRIDGE $5,399,000
County NC-12.12 COAL CREEK PARKWAY CONSTRUCT SE 72 ST RENTON/CL $6,398,000
County NC-58 SE 128 ST @ 164 AVE SE $1,011,000
County N-11.20 100 AVE NE NE 139 ST NE 145 ST $3,725,000
County N-12.10 JUANITA-WOODINVILLE WY NE 100 AVE NE NE 145 ST $3,478,000
County N-16.11 JUANITA-WOODINVILLE WAY NE NE 145 ST 112 AVE NE $1,981,000
County N-16.20 JUANITA-WOODINVILLE WAY NE 112 AVE NE I-405 $3,367,000
County N-19.20 NE 160 ST 116 AVE NE 124 AVE NE $2,028,000
County N-28.10 NE 124 ST PH II 132 PL NE WILLOWS RD $10,502,000
County N-28.30 NE 124 ST PH III WILLOWS RD SR-202 $7,293,000
County N-30.10 NE 124 ST/NE 128 ST SR 202 172 AVE NE $6,201,000
County N-35.12 WOODINVILLE-DUVALL RD CONST 171 AVE NE AVONDALE RD $9,423,000
County N-37 WOODINVILLE CBD BYPASS NE 175 ST 140 AVE NE $6,674,000
County N-39 NE 195 ST 139 AVE NE WOOD-DUV. @ 149 $15,759,000
NE
County N-45.12 124TH AVE NE CONSTRUCT NE 132 ST NE 145 ST $4,936,000
County N-61.10 132 PL / AVE NE PHASE I NE 124 ST NE 132 ST $6,553,000
County S-85 5 AVE NE @ NE 175 ST $2,967,000
County SC-23 140 PL SE SR-169 PETROVITSKY RD $16,706,000
County SC-26.12 SE 240 ST 116 AVE SE 138 AVE SE $11,963,000
County SC-34.12 SE 208 ST PH II 116 AVE SE 132 AVE SE $9,748,000
County SC-55.10 140 PL SE/132 AVE SE SE 176 ST SE 196 ST $16,410,000
County SC-55.32 140/132 AVE SE PH III CONST SE 208 ST SE 224 ST $8,815,000
County SC-55.42 140 PL SE/132 AVE SE PH IV CONST SE 224 ST SE 242 ST $7,180,000
County SC-68.23 SE CARR RD DESIGN AND 108 AVE SE SR-167 $7,560,000
CONSTRUCTION
County SC-78.12 PETROVITSKY RD PHASE III 143 AVE SE 151 AVE SE $6,935,000
County SC-150.12 SE 212 WY / SE 208 CONST SR-515 SR-167 $8,297,000
County SC-201 140 AVE SE @ PETROVITSKY $7,074,000
County SC-215 SR-515 (BENSON RD) @ PETROVITSKY $9,415,000
Total $395,706,000
((Issaquah FRONT STREET SOUTH S 2 St Issq City Limits $1,627,636
Issaquah SE ISSAQUAH BYPASS RD NE 100 St NE 116 St $16,440,760
Issaquah MAPLE ST SR-900 Locust Way $7,192,482
Issaquah MAPLE ST SR-900 Newport Way $2,000,000
Issaquah SE NEWPORT WAY Maple St Lakemont Blvd $2,000,000
Issaquah SE NEWPORT WAY Locust Way Sunset Blvd $3,597,590
Total $32,858,468))
Newcastle Newcastle - COAL CREEK PARKWAY SE 72 ST RENTON C/L $33,947,000
CONST
Total $33,947,000
Redmond WILLOWS ROAD NE 90 St NE 95 St $1,475,000
Redmond WILLOWS ROAD NE 100 St NE 116 St $2,025,000
Redmond WILLOWS ROAD NE 116 St NE 124 St $4,260,000
Redmond West Lake Sammamish Parkway SR-520 Bel-Red Rd $8,100,000
Redmond West Lake Sammamish Parkway Leary Way SR-520 eastbd ramp $1,900,000
Redmond NE 90 STREET 154 Ave NE 160 Ave NE $12,500,000
Redmond UNION HILL ROAD Avondale Rd 178 Pl NE $1,730,000
Redmond UNION HILL ROAD 178 Pl NE Redmond City Limits $6,500,000
Redmond 160 AVE NE NE 90 St Redmond Woodinville $12,000,000
Rd
Redmond EAST LAKE SAMMAMISH PKWY Redmond Way 187 Ave NE $7,300,000
Redmond NE 116 ST Redmond Woodinville Rd Avondale Rd $12,500,000
Redmond 188 AVE NE Redmond Way Union Hill Rd $7,300,000
Redmond 185 AVE NE NE 80 St Union Hill Rd $4,950,000
Redmond AVONDALE RD - HOV Union Hill Rd SR-520 $1,540,000
Redmond WILLOWS RD @ NE 116 ST $100,000
Redmond WILLOWS RD @ NE 90 ST $565,000
Redmond UNION HILL RD @ 178 PL NE $254,000
Redmond UNION HILL RD @ AVONDALE RD $725,000
Redmond 160 Ave NE Redmond- Woodinville- NE 124 St $3,000,000
Duvall Rd @ 106
Total $88,724,000
Covington 9001 SR-516 Stage 1B $1,351,670
Covington 9004 Wax Road/180th Ave. SE SR 516 262nd Pl $7,380,000
Covington 9005 SE 240th St. SE 180 St. SE 196 St. $720,000
Covington 9006 180th Ave. SE. SE Wax Rd SE 256 $1,110,000
Covington 9013 Covington Way SE Wax Rd. 164th Pl. SE $610,000
Covington 9016 SE 256th St.@148th Ave. SE $850,000
Covington 9020 SE 256th St. 148th Ave. 164th Ave. $15,171,000
Covington 9021 SE 256th St. 164th Ave. 180th Ave. $7,310,000
Covington 9023 164th Ave. SE Phase I and II SE 256 St. SE 248th St. $1,128,000
Covington 9036 SR-516 Wax Rd. Jenkins Cr. $2,620,000
Total $38,250,670
Grand Total $((589,486,138)) 556,627,670