File #: FCD2014-19    Version:
Type: FCD Resolution Status: Passed
File created: In control: King County Flood Control District
On agenda: Final action: 11/10/2014
Enactment date: Enactment #:
Title: A RESOLUTION relating to the Boeing Levee height increase and United States Army Corps of Engineers Ecosystem Restoration Project on the Green river in the city of Kent, and authorizing the chair to enter into an agreement with the city of Kent.
Attachments: 1. FCD2014-19_20150FINAL.pdf, 2. A. Agreement for Levee Construction, Operation and Maintenance, Boeing Levee Height Increase and USACE Ecosystem Restoration Project, River Mile 17.09 to 17.85, Right Bank dated 11-07-14, 3. A. Agreement for Levee Construction, Operation and Maintenance, Boeing Levee Height Increase and USACE Ecosystem Restoration Project, River Mile 17.09 to 17.85, Right Bank, 4. FCD 2014-19 Amendment package 11-10-14.pdf
title
A RESOLUTION relating to the Boeing Levee height increase and United States Army Corps of Engineers Ecosystem Restoration Project on the Green river in the city of Kent, and authorizing the chair to enter into an agreement with the city of Kent.
body
WHEREAS, The King County Flood Control Zone District board of supervisors desires to improve the right bank of the Green river, from river mile 17.09 to 17.85 by constructing a levee improvement project to increase the height of the levee to achieve the Lower Green River System-wide Improvement Framework's provisional flood protection goal of 500-year, or 18,800 cfs, plus three feet of freeboard, and an ecosystem restoration project described in Exhibit A to Attachment A, which generally consists of revegetation and habitat restoration work along this portion of the Green River (collectively, the "Project"); and
WHEREAS, the Project is part of a plan to reduce flood risk to regionally significant economic assets in the city of Kent and in the Lower Green river valley, restore critical salmon habitat for listed Chinook and other salmon species and support recreational opportunities for the community along the river and its shoreline environment; and
WHEREAS, the Project is planned for construction from 2015 through 2016; and
WHEREAS, the Project specifically will improve embankment stability, improve salmon and wildlife habitat and preserve recreational opportunities; and
WHEREAS, the United States Army Corps of Engineers ("USACE") will design, construct and install the Project pursuant to an agreement between the city of Kent and USACE; and
WHEREAS, in Resolution FCD2013-14.3, as amended by Resolution
FCD2014-08, the District committed to provide a portion of the funding for the Project; and
WHEREAS, the board of supervisors desires to enter into an agreement with the city of Kent regarding the terms and conditions of design, construction, installation, operation, ...

Click here for full text